As a part of our work trip to Letbridge region Solar Plantation completed this 133KW solar project in summer 2016. This one was one of the three project completed. Schletter Canada managed to manufacture and ship all materials before originally scheduled date. Perfect dry weather conditions combined with the grass mowed nice and low for us by the land owner, allowed us to reach very fast installation speeds at this site. All projects in this trip were completed ahead of schedule.
Solar Plantation scope of work included: soil sampling, engineering, site layout, pile-driving and racking installation. The project is completed under Alberta Growing Forward program and in a partnership with Solar Optix.
133KW solar power system in Municipal District of Taber | Alberta by Solar buildings blog
Contact us for a free estimate
Contact us to learn about solar rebates. We optimize systems for your needs.
780-566-3000